Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA KarachiEstablished

Construction in DHA Phase 1

Karachi's original DHA — 1 Kanal estates, sea-side proximity, and the oldest construction stock in the city.

Status
Established
Launched
1980s
Karachi grey rate
PKR 2,400 – 3,500 / sqft
Karachi turnkey rate
PKR 5,800 – 9,000 / sqft

About construction in DHA Phase 1

DHA Phase 1 is where DHA Karachi began. Plots are mostly 1 Kanal and 2 Kanal, fully built up with homes that are now 30–40 years old. Most of the active construction in Phase 1 is renovation, basement addition, or full reconstruction. The proximity to the Arabian Sea adds a layer of complexity to every build — we mandate anti-corrosion treatment on all rebar and use epoxy-coated steel as standard in this phase. Material delivery routes via Khayaban-e-Iqbal are well-established but can be tight during peak hours.

What's distinctive about DHA Phase 1

  • Oldest stock in DHA Karachi — bulk of work is renovation or rebuild
  • Coastal humidity mandates epoxy-coated rebar and anti-corrosion concrete
  • Khayaban-e-Iqbal is the primary material delivery artery
  • Higher per-sqft rates than inland DHA cities due to salinity protection

Commercial hubs

  • Khayaban-e-Iqbal Commercial
  • Phase 1 Market

Nearby landmarks

  • Clifton
  • Sea View

Plot sizes & bylaws in DHA Phase 1

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
1 Kanal50×90 ftG+255%F15, S5, R5

DHA Phase 1 construction — FAQ

How much does construction cost in DHA Phase 1 in 2026?

In DHA Phase 1, grey structure runs at PKR 2,400 – 3,500 / sqft and turnkey at PKR 5,800 – 9,000 / sqft in 2026, in line with DHA Karachi rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 1?

The popular plot sizes in DHA Phase 1 are 1 Kanal, 2 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 1?

A typical 1 Kanal home in DHA Phase 1 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 1?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Karachi cost calculator.

Building in DHA Phase 1?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.