Construction in DHA Bahawalpur Sector D
Mid-development sector — 10 Marla and 1 Kanal supply, infrastructure progressing.
About construction in DHA Bahawalpur Sector D
Sector D sits in the middle of DHA Bahawalpur's development arc. Possession is rolling out and infrastructure is progressing block by block. Plot mix is 10 Marla and 1 Kanal-dominant, and pricing is attractive for early movers. The construction incentive applies here too — owners who complete by April 2027 receive a 100% Development Charges Waiver.
What's distinctive about Sector D
- Mid-development sector — possession rolling out block by block
- 10 Marla and 1 Kanal-dominant supply
- Construction incentive applies — completion by April 2027 = 100% DC waiver
- Attractive pricing for early movers
Plot sizes & bylaws in Sector D
What you can build, how much you can cover, and what setbacks apply.
| Plot | Dimensions | Elevation | Coverage | Setbacks |
|---|---|---|---|---|
| 10 Marla | 35×65 ft | G+2 | 60% | F10, S3, R3 |
| 1 Kanal | 50×90 ft | G+2 | 55% | F15, S5, R5 |
Other phases in DHA Bahawalpur
Build the comparison out — every Bahawalpur phase has a different character.
DHA Bahawalpur Sector A
Premier Block A — DHA Bahawalpur's most developed sector with full possession and active construction.
DHA Bahawalpur Sector B
Premier Block B — companion sector with the same possession status and construction momentum.
DHA Bahawalpur Sector N
Developing sector — early-mover plots and pricing, infrastructure rolling out.
DHA Bahawalpur Sector D construction — FAQ
How much does construction cost in DHA Bahawalpur Sector D in 2026?
In DHA Bahawalpur Sector D, grey structure runs at PKR 1,900 – 2,600 / sqft and turnkey at PKR 5,000 – 7,200 / sqft in 2026, in line with DHA Bahawalpur rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.
What plot sizes can you build on in Sector D?
The popular plot sizes in Sector D are 10 Marla, 1 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.
How long does a build take in Sector D?
A typical 1 Kanal home in Sector D takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.
Do you handle DHA map approval for Sector D?
Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.
For an instant figure by plot size and finish, use the Bahawalpur cost calculator.