Grey Structure Construction in DHA Lahore
Grey Structure Construction in DHA Lahore costs PKR 2,200 – 3,200 / sqft in 2026. Grey structure is the complete structural shell of your Lahore home — foundation, RCC columns, beams and slabs, block masonry, plaster and internal conduiting — built to DHA bylaws and handed over ready for finishing.
What grey structure includes in Lahore
Foundation, DPC and plinth
RCC columns, beams and slabs — Grade 60 steel, design-mix concrete
Block masonry and internal + external plaster
Underground water tank and septic tank
Electrical and plumbing conduiting (no fixtures yet)
Staircase, parapet and boundary wall
Lahore grey structure rates (2026)
Indicative 2026 rates for DHA Lahore. We confirm an exact figure once we see your plot and spec.
| Grey Structure Construction (Lahore) | PKR 2,200 – 3,200 / sqft |
|---|---|
| Grey structure (Lahore) | PKR 2,200 – 3,200 / sqft |
| Turnkey (Lahore) | PKR 5,500 – 8,500 / sqft |
| Phases we cover | 12 phases · Premium tier |
Use the Lahore cost calculator for an instant estimate by plot size and finish.
How grey structure works in Lahore
Layout & soil check
Plot demarcation and a soil bearing check before any excavation.
Foundation & plinth
Excavation, footings, DPC and plinth beam to the approved drawings.
Superstructure
Ground and upper-floor columns, beams and slabs in design-mix concrete.
Masonry & plaster
Block masonry, then internal and external plaster.
Curing & handover
Documented curing, then handover ready for the finishing crew.
Phases of DHA Lahore we build in
Grey Structure Construction across every phase of DHA Lahore.
Grey Structure Construction in Lahore — FAQ
How much does grey structure cost in DHA Lahore in 2026?
Grey structure in DHA Lahore runs PKR 2,200 – 3,200 / sqft in 2026, covering foundation to roof slab with Grade 60 steel and design-mix concrete — finishing is quoted separately.
How long does a Lahore grey structure take?
A 1 Kanal grey structure typically takes 4–6 months in Lahore, depending on plot size, basement, and weather.
Do you handle the DHA map approval for Lahore too?
Yes — we prepare and submit the building-plan file and follow it to approval, then start the grey structure once the plan is sanctioned.
Grey Structure Construction in other cities
Other services in Lahore
Get a grey structure quote for DHA Lahore
Send us your plot details. We reply within 24 hours with a written 2026 quote and a realistic timeline.