Grey Structure Construction in DHA Multan
Grey Structure Construction in DHA Multan costs PKR 1,900 – 2,900 / sqft in 2026. Grey structure is the complete structural shell of your Multan home — foundation, RCC columns, beams and slabs, block masonry, plaster and internal conduiting — built to DHA bylaws and handed over ready for finishing.
What grey structure includes in Multan
Foundation, DPC and plinth
RCC columns, beams and slabs — Grade 60 steel, design-mix concrete
Block masonry and internal + external plaster
Underground water tank and septic tank
Electrical and plumbing conduiting (no fixtures yet)
Staircase, parapet and boundary wall
Multan grey structure rates (2026)
Indicative 2026 rates for DHA Multan. We confirm an exact figure once we see your plot and spec.
| Grey Structure Construction (Multan) | PKR 1,900 – 2,900 / sqft |
|---|---|
| Grey structure (Multan) | PKR 1,900 – 2,900 / sqft |
| Turnkey (Multan) | PKR 5,200 – 7,500 / sqft |
| Phases we cover | 6 phases · Standard tier |
Use the Multan cost calculator for an instant estimate by plot size and finish.
How grey structure works in Multan
Layout & soil check
Plot demarcation and a soil bearing check before any excavation.
Foundation & plinth
Excavation, footings, DPC and plinth beam to the approved drawings.
Superstructure
Ground and upper-floor columns, beams and slabs in design-mix concrete.
Masonry & plaster
Block masonry, then internal and external plaster.
Curing & handover
Documented curing, then handover ready for the finishing crew.
Grey Structure Construction in Multan — FAQ
How much does grey structure cost in DHA Multan in 2026?
Grey structure in DHA Multan runs PKR 1,900 – 2,900 / sqft in 2026, covering foundation to roof slab with Grade 60 steel and design-mix concrete — finishing is quoted separately.
How long does a Multan grey structure take?
A 1 Kanal grey structure typically takes 4–6 months in Multan, depending on plot size, basement, and weather.
Do you handle the DHA map approval for Multan too?
Yes — we prepare and submit the building-plan file and follow it to approval, then start the grey structure once the plan is sanctioned.
Grey Structure Construction in other cities
Other services in Multan
Get a grey structure quote for DHA Multan
Send us your plot details. We reply within 24 hours with a written 2026 quote and a realistic timeline.