10 Marla house construction cost in DHA Karachi (2026)
Building a 10 Marla house in DHA Karachi costs about PKR 84.00 Lakh–PKR 1.47 Cr for grey structure and PKR 2.03 Cr–PKR 5.67 Cr for a turnkey (move-in-ready) home in 2026, depending on finish level and built-up area.
10 Marla cost breakdown in Karachi (2026)
Based on a typical 3,500–4,200 sqft covered (built-up) area for a 10 Marla plot. Figures are indicative 2026 estimates — we confirm an exact number after seeing your plot and spec.
| Finish level | Rate / sqft | Estimated total |
|---|---|---|
| Grey structure | PKR 2,400–3,500 | PKR 84.00 Lakh – PKR 1.47 Cr |
| Standard turnkey | PKR 5,800–7,400 | PKR 2.03 Cr – PKR 3.11 Cr |
| Premium turnkey | PKR 7,400–9,000 | PKR 2.59 Cr – PKR 3.78 Cr |
| Luxury turnkey | PKR 9,000–13,500 | PKR 3.15 Cr – PKR 5.67 Cr |
Grey structure is the bare structural shell; turnkey adds all finishing. See the difference in our grey structure and turnkey pages for Karachi.
What changes a 10 Marla build cost in Karachi
Covered (built-up) area — number of floors and basement
Finish level — grey, standard, premium or luxury turnkey
Material spec — steel grade, cement brand, imported vs local fittings
Phase and plot specifics in Karachi — access, soil, setbacks
Structural extras — basement, pool, boundary walls
Market movement — cement and steel prices through 2026
10 Marla cost in Karachi — FAQ
How much does it cost to build a 10 Marla house in DHA Karachi in 2026?
A 10 Marla house in DHA Karachi costs about PKR 84.00 Lakh–PKR 1.47 Cr for grey structure, and PKR 2.03 Cr–PKR 5.67 Cr for a complete turnkey home in 2026, depending on finish and built-up area.
What is the per-square-foot construction rate in Karachi?
In 2026, grey structure in Karachi runs PKR 2,400 – 3,500 / sqft and turnkey PKR 5,800 – 9,000 / sqft. The 10 Marla totals above multiply that by the typical built-up area.
How long does a 10 Marla house take to build?
Grey structure for a 10 Marla typically takes 4–6 months; a full turnkey 10 Marla home usually completes in 10–14 months, depending on spec, basement and weather.
Other sizes in Karachi
Build in Karachi
Get an exact 10 Marla quote for Karachi
Send us your plot number and finish preference. We reply within 24 hours with a written 2026 quote.