5 Marla house construction cost in DHA Karachi (2026)
Building a 5 Marla house in DHA Karachi costs about PKR 33.60 Lakh–PKR 59.50 Lakh for grey structure and PKR 81.20 Lakh–PKR 2.29 Cr for a turnkey (move-in-ready) home in 2026, depending on finish level and built-up area.
5 Marla cost breakdown in Karachi (2026)
Based on a typical 1,400–1,700 sqft covered (built-up) area for a 5 Marla plot. Figures are indicative 2026 estimates — we confirm an exact number after seeing your plot and spec.
| Finish level | Rate / sqft | Estimated total |
|---|---|---|
| Grey structure | PKR 2,400–3,500 | PKR 33.60 Lakh – PKR 59.50 Lakh |
| Standard turnkey | PKR 5,800–7,400 | PKR 81.20 Lakh – PKR 1.26 Cr |
| Premium turnkey | PKR 7,400–9,000 | PKR 1.04 Cr – PKR 1.53 Cr |
| Luxury turnkey | PKR 9,000–13,500 | PKR 1.26 Cr – PKR 2.29 Cr |
Grey structure is the bare structural shell; turnkey adds all finishing. See the difference in our grey structure and turnkey pages for Karachi.
What changes a 5 Marla build cost in Karachi
Covered (built-up) area — number of floors and basement
Finish level — grey, standard, premium or luxury turnkey
Material spec — steel grade, cement brand, imported vs local fittings
Phase and plot specifics in Karachi — access, soil, setbacks
Structural extras — basement, pool, boundary walls
Market movement — cement and steel prices through 2026
5 Marla cost in Karachi — FAQ
How much does it cost to build a 5 Marla house in DHA Karachi in 2026?
A 5 Marla house in DHA Karachi costs about PKR 33.60 Lakh–PKR 59.50 Lakh for grey structure, and PKR 81.20 Lakh–PKR 2.29 Cr for a complete turnkey home in 2026, depending on finish and built-up area.
What is the per-square-foot construction rate in Karachi?
In 2026, grey structure in Karachi runs PKR 2,400 – 3,500 / sqft and turnkey PKR 5,800 – 9,000 / sqft. The 5 Marla totals above multiply that by the typical built-up area.
How long does a 5 Marla house take to build?
Grey structure for a 5 Marla typically takes 4–6 months; a full turnkey 5 Marla home usually completes in 10–14 months, depending on spec, basement and weather.
Other sizes in Karachi
Build in Karachi
Get an exact 5 Marla quote for Karachi
Send us your plot number and finish preference. We reply within 24 hours with a written 2026 quote.