Construction in DHA Peshawar Sector D
Mid-sized residential sector — 10 Marla and 1 Kanal supply, growing infrastructure.
About construction in DHA Peshawar Sector D
Sector D is a mid-sized residential sector with a 10 Marla and 1 Kanal-dominant plot mix. Infrastructure is more mature than the developing sectors but still less established than Sector A. Construction activity is moderate; typical projects are 10 Marla or 1 Kanal grey + mid-tier turnkey.
What's distinctive about Sector D
- 10 Marla and 1 Kanal-dominant supply
- Growing infrastructure base
- Moderate construction pace
- Common project: 10 Marla / 1 Kanal grey + mid-tier turnkey
Plot sizes & bylaws in Sector D
What you can build, how much you can cover, and what setbacks apply.
| Plot | Dimensions | Elevation | Coverage | Setbacks |
|---|---|---|---|---|
| 10 Marla | 35×65 ft | G+2 | 60% | F10, S3, R3 |
| 1 Kanal | 50×90 ft | G+2 | 55% | F15, S5, R5 |
Other phases in DHA Peshawar
Build the comparison out — every Peshawar phase has a different character.
DHA Peshawar Sector A
Commercial-led sector — Sector A is where DHA Peshawar's first commercial belt is taking shape.
DHA Peshawar Sector B
Residential 10 Marla and 1 Kanal sector — quieter pace, settled streetscape.
DHA Peshawar Sector F
5 Marla and 10 Marla sector — DHA Peshawar's affordable end-user destination.
DHA Peshawar Sector G
Newly inaugurated sector — Sector G's possession opened in 2024 and the first builds are starting.
DHA Peshawar Sector D construction — FAQ
How much does construction cost in DHA Peshawar Sector D in 2026?
In DHA Peshawar Sector D, grey structure runs at PKR 2,400 – 3,300 / sqft and turnkey at PKR 5,800 – 8,000 / sqft in 2026, in line with DHA Peshawar rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.
What plot sizes can you build on in Sector D?
The popular plot sizes in Sector D are 10 Marla, 1 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.
How long does a build take in Sector D?
A typical 1 Kanal home in Sector D takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.
Do you handle DHA map approval for Sector D?
Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.
For an instant figure by plot size and finish, use the Peshawar cost calculator.
Building in Sector D?
Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.