Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA LahoreEstablished

Construction in DHA Phase 2

Quiet, fully developed Lahore phase with established 1 Kanal homes — the renovation and basement-addition belt.

Status
Established
Launched
1990s
Lahore grey rate
PKR 2,200 – 3,200 / sqft
Lahore turnkey rate
PKR 5,500 – 8,500 / sqft

About construction in DHA Phase 2

Phase 2 sits next to Phase 1 and shares the same character — wide streets, mature trees, established families. New ground-up construction is rare; what we mostly do here is demolition-and-rebuild on 1 Kanal and 2 Kanal plots that families have inherited and want to modernise. The phase is well connected to Lahore Ring Road and Cantt Bazaar, which is useful for material logistics. We have completed eight projects in Phase 2 since 2018, most of them with single-storey basements added to the original footprint.

What's distinctive about DHA Phase 2

  • Heavy demolition-and-rebuild traffic from second-generation owners
  • Common requests: single-storey basement + modernised facade
  • Wide internal roads simplify crane and truck movement
  • Older boundary walls often need re-engineering for current bylaws

Commercial hubs

  • H Block Phase 2
  • Bedian Road Commercial

Nearby landmarks

  • Lahore Cantt
  • Bedian Road

Plot sizes & bylaws in DHA Phase 2

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
1 Kanal50×90 ftG+255%F15, S5, R5
2 Kanal100×90 ftG+250%F20, S7, R7

DHA Phase 2 construction — FAQ

How much does construction cost in DHA Phase 2 in 2026?

In DHA Phase 2, grey structure runs at PKR 2,200 – 3,200 / sqft and turnkey at PKR 5,500 – 8,500 / sqft in 2026, in line with DHA Lahore rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 2?

The popular plot sizes in DHA Phase 2 are 1 Kanal, 2 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 2?

A typical 1 Kanal home in DHA Phase 2 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 2?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Lahore cost calculator.

Building in DHA Phase 2?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.