Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA LahoreActive

Construction in DHA Phase 6

The most active construction phase in DHA Lahore — modern grids, Broadway commercial, and our biggest project pipeline.

Status
Active
Launched
Late 2000s
Lahore grey rate
PKR 2,200 – 3,200 / sqft
Lahore turnkey rate
PKR 5,500 – 8,500 / sqft

About construction in DHA Phase 6

Phase 6 is where most of our current Lahore work happens. The phase is roughly 80% occupied, leaving enough vacant plots that we always have multiple active grey-structure projects running at the same time. Plot mix is varied — strong supply of 5 Marla, 10 Marla, and 1 Kanal — which makes it the friendliest phase for buyers moving up from smaller plots. Phase 6's Broadway commercial belt and proximity to Bedian Road make it a popular destination, and the bylaw enforcement here is strict but predictable. Our 20-day map approval timeline is most reliable in Phase 6 because we have the deepest relationship with the local building control team.

What's distinctive about DHA Phase 6

  • Our highest project density in DHA Lahore — 12+ active builds at any time
  • Plot mix friendly to 5 Marla / 10 Marla / 1 Kanal — best phase for upgraders
  • Broadway DHA, Big Bird, and Bedian Road within minutes
  • Predictable 20-day map approval — strongest local working relationship

Commercial hubs

  • Broadway DHA
  • Sector C Commercial
  • MM Alam Road extension

Nearby landmarks

  • Bedian Road
  • DHA Polo Club

Plot sizes & bylaws in DHA Phase 6

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
5 Marla25×45 ftG+165%F5, S3, R3
7 Marla30×53 ftG+165%F5, S3, R3
10 Marla35×65 ftG+260%F10, S3, R3
1 Kanal50×90 ftG+255%F15, S5, R5
2 Kanal100×90 ftG+250%F20, S7, R7

Projects we've built in DHA Phase 6

Recent and active builds in this area.

Contemporary 1 Kanal villa, DHA Phase 6 Lahore1 Kanal
DHA Phase 6, Lahore

Contemporary 1 Kanal villa, DHA Phase 6 Lahore

6,400 sqft (G+2 + basement)

Premium TurnkeyCompleted

DHA Phase 6 construction — FAQ

How much does construction cost in DHA Phase 6 in 2026?

In DHA Phase 6, grey structure runs at PKR 2,200 – 3,200 / sqft and turnkey at PKR 5,500 – 8,500 / sqft in 2026, in line with DHA Lahore rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 6?

The popular plot sizes in DHA Phase 6 are 5 Marla, 10 Marla, 1 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 6?

A typical 1 Kanal home in DHA Phase 6 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 6?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Lahore cost calculator.

Building in DHA Phase 6?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.