Construction in DHA Phase 4

Connected to Lahore Cantt — quiet, residential, and a regular destination for our turnkey teams.

Status
Established
Launched
Early 2000s
Lahore grey rate
PKR 2,200 – 3,200 / sqft
Lahore turnkey rate
PKR 5,500 – 8,500 / sqft

About construction in DHA Phase 4

Phase 4 is best known for its straight-grid layout and walking-distance access to Phase 4 Commercial and Cantt Bazaar. Plot sizes here are predominantly 1 Kanal with a healthy supply of 2 Kanal corner plots. Many of our turnkey projects in DHA Lahore have been in Phase 4 because owners often hold the plot for years before commissioning a build, leaving us with clean, well-documented allotment papers and faster map approvals. The phase is also where we have done the most basement-plus-pool combinations, given the larger plot inventory.

What's distinctive about DHA Phase 4

  • 1 Kanal corner plots are the typical project here
  • Clean allotment documentation = faster 20-day map approval cycle
  • Highest density of basement + pool combinations we've delivered in DHA Lahore
  • Walkable commercial — owners often come on site themselves

Commercial hubs

  • Phase 4 Commercial
  • Cantt Bazaar

Nearby landmarks

  • Lahore Cantt Bazaar
  • DHA Sports Club

Plot sizes & bylaws in DHA Phase 4

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
1 Kanal50×90 ftG+255%F15, S5, R5

DHA Phase 4 construction — FAQ

How much does construction cost in DHA Phase 4 in 2026?

In DHA Phase 4, grey structure runs at PKR 2,200 – 3,200 / sqft and turnkey at PKR 5,500 – 8,500 / sqft in 2026, in line with DHA Lahore rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 4?

The popular plot sizes in DHA Phase 4 are 1 Kanal, 2 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 4?

A typical 1 Kanal home in DHA Phase 4 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 4?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Lahore cost calculator.

Building in DHA Phase 4?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.