DHA Islamabad-RawalpindiActive

Construction in DHA Phase 3

Largely residential phase along Islamabad Highway — steady 10 Marla and 1 Kanal construction pipeline.

Status
Active
Launched
Early 2000s
Islamabad-Rawalpindi grey rate
PKR 2,500 – 3,700 / sqft
Islamabad-Rawalpindi turnkey rate
PKR 6,000 – 8,800 / sqft

About construction in DHA Phase 3

Phase 3 is a steady mid-sized DHAI-R phase along Islamabad Highway. Plot supply is mostly 10 Marla and 1 Kanal, and the area is roughly 65% occupied. Topography here is more even than Phase 2, which simplifies excavation. We run 4–6 active projects in Phase 3 at any time, mostly 1 Kanal grey-structure builds with mid-tier turnkey finishing.

What's distinctive about DHA Phase 3

  • More even topography than Phase 2 — simpler excavation
  • 10 Marla and 1 Kanal-dominant supply
  • Islamabad Highway frontage simplifies bulk material delivery
  • Common project: 1 Kanal grey + mid-tier turnkey

Commercial hubs

  • Phase 3 Sector E Commercial

Nearby landmarks

  • Islamabad Highway

Plot sizes & bylaws in DHA Phase 3

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
5 Marla25×45 ftG+165%F5, S3, R3
10 Marla35×65 ftG+260%F10, S3, R3
1 Kanal50×90 ftG+255%F15, S5, R5

DHA Phase 3 construction — FAQ

How much does construction cost in DHA Phase 3 in 2026?

In DHA Phase 3, grey structure runs at PKR 2,500 – 3,700 / sqft and turnkey at PKR 6,000 – 8,800 / sqft in 2026, in line with DHA Islamabad-Rawalpindi rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 3?

The popular plot sizes in DHA Phase 3 are 10 Marla, 1 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 3?

A typical 1 Kanal home in DHA Phase 3 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 3?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Islamabad-Rawalpindi cost calculator.