Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA KarachiActive

Construction in DHA Phase 6

Active 10 Marla and 1 Kanal construction phase — Karachi's busiest grey-structure pipeline.

Status
Active
Launched
2000s
Karachi grey rate
PKR 2,400 – 3,500 / sqft
Karachi turnkey rate
PKR 5,800 – 9,000 / sqft

About construction in DHA Phase 6

Phase 6 is currently the most active DHA Karachi phase for new construction. Plot supply is varied — 10 Marla, 1 Kanal, and 2 Kanal — and the phase is roughly 70% occupied with active possession on remaining plots. We run multiple grey-structure projects here at any given time, mostly 10 Marla and 1 Kanal builds with mid-to-high turnkey specs. Phase 6 is well-connected via Khayaban-e-Hilal and offers a good mix of established neighbours and new construction. Our 20-day map approval cycle is most reliable in Phase 6 because of the steady working volume with the local DHA building control desk.

What's distinctive about DHA Phase 6

  • Karachi's busiest grey-structure pipeline — multiple active builds at any time
  • 10 Marla, 1 Kanal, and 2 Kanal supply all available
  • Reliable 20-day map approval cycle
  • Strong mix of new construction and established neighbours

Commercial hubs

  • Khayaban-e-Shaheen extension
  • Phase 6 Bukhari

Nearby landmarks

  • Phase 5 link
  • Khayaban-e-Hilal

Plot sizes & bylaws in DHA Phase 6

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
10 Marla35×65 ftG+260%F10, S3, R3
1 Kanal50×90 ftG+255%F15, S5, R5
2 Kanal100×90 ftG+250%F20, S7, R7

Projects we've built in DHA Phase 6

Recent and active builds in this area.

10 Marla full rebuild, DHA Phase 6 Karachi10 Marla
DHA Phase 6, Karachi

10 Marla full rebuild, DHA Phase 6 Karachi

4,000 sqft (G+2)

Standard TurnkeyCompleted

DHA Phase 6 construction — FAQ

How much does construction cost in DHA Phase 6 in 2026?

In DHA Phase 6, grey structure runs at PKR 2,400 – 3,500 / sqft and turnkey at PKR 5,800 – 9,000 / sqft in 2026, in line with DHA Karachi rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 6?

The popular plot sizes in DHA Phase 6 are 10 Marla, 1 Kanal, 2 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 6?

A typical 1 Kanal home in DHA Phase 6 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 6?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Karachi cost calculator.

Building in DHA Phase 6?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.