Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA KarachiActive

Construction in DHA Phase 7

The 10 Marla and 1 Kanal value belt — strong supply, modern infrastructure, family-mover destination.

Status
Active
Launched
2000s
Karachi grey rate
PKR 2,400 – 3,500 / sqft
Karachi turnkey rate
PKR 5,800 – 9,000 / sqft

About construction in DHA Phase 7

Phase 7 has emerged as DHA Karachi's value-and-volume phase. Plot supply is heavily weighted toward 10 Marla and 1 Kanal with newer infrastructure than older phases. Construction activity is intense — a steady flow of grey-structure and turnkey jobs across all plot sizes. We see a lot of demand here for basement plus pool on 1 Kanal plots, and modern open-plan layouts with double-height entrances. Khayaban-e-Mujahid and Khayaban-e-Rahat are the main commercial belts. 2026 grey rates run at PKR 2,500–3,200/sqft.

What's distinctive about DHA Phase 7

  • Active construction at all plot sizes from 5 Marla to 2 Kanal
  • High demand: 1 Kanal grey + basement + pool
  • Newer infrastructure means simpler material logistics than older phases
  • Khayaban-e-Mujahid and Khayaban-e-Rahat are the main retail anchors

Commercial hubs

  • Khayaban-e-Mujahid
  • Khayaban-e-Rahat
  • Bukhari Commercial Phase 7

Nearby landmarks

  • Khayaban-e-Saadi
  • Phase 6 link

Plot sizes & bylaws in DHA Phase 7

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
5 Marla25×45 ftG+165%F5, S3, R3
10 Marla35×65 ftG+260%F10, S3, R3
1 Kanal50×90 ftG+255%F15, S5, R5

DHA Phase 7 construction — FAQ

How much does construction cost in DHA Phase 7 in 2026?

In DHA Phase 7, grey structure runs at PKR 2,400 – 3,500 / sqft and turnkey at PKR 5,800 – 9,000 / sqft in 2026, in line with DHA Karachi rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 7?

The popular plot sizes in DHA Phase 7 are 5 Marla, 10 Marla, 1 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 7?

A typical 1 Kanal home in DHA Phase 7 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 7?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Karachi cost calculator.

Building in DHA Phase 7?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.