Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA KarachiDeveloping

Construction in DHA Phase 8

The newest DHA Karachi expansion — Zone A, B, C, plus coastal frontage and biggest plot inventory.

Status
Developing
Launched
2010s
Karachi grey rate
PKR 2,400 – 3,500 / sqft
Karachi turnkey rate
PKR 5,800 – 9,000 / sqft

About construction in DHA Phase 8

Phase 8 is DHA Karachi's biggest and newest phase, sprawling across Zones A through E, plus the coastal extension. The phase has the largest pool of new plot supply in DHA Karachi, with plot sizes ranging from 5 Marla all the way to 4 Kanal coastal estates. New ground-up construction is the dominant project type here. The coastal sub-zones require the most aggressive salinity-defence engineering we do anywhere — high-spec epoxy steel, chemically-buffered concrete, and aggressive waterproofing on basements. Phase 8's Al-Murtaza Commercial, Creek Vista, and Ittehad Commercial are the main retail anchors.

What's distinctive about DHA Phase 8

  • Newest DHA Karachi expansion — largest new plot inventory
  • Plot sizes from 5 Marla to 4 Kanal coastal estates
  • Most aggressive salinity-defence engineering of any DHA Karachi phase
  • Creek and Sea-facing plots demand premium waterproofing on basements

Commercial hubs

  • Al Murtaza Commercial
  • Creek Vista
  • Ittehad Commercial

Nearby landmarks

  • Creek Vista
  • DHA Sunset Boulevard

Plot sizes & bylaws in DHA Phase 8

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
5 Marla25×45 ftG+165%F5, S3, R3
10 Marla35×65 ftG+260%F10, S3, R3
1 Kanal50×90 ftG+255%F15, S5, R5
2 Kanal100×90 ftG+250%F20, S7, R7
4 Kanal200×90 ftG+245%F20, S7, R7

Projects we've built in DHA Phase 8

Recent and active builds in this area.

1 Kanal coastal home, DHA Phase 8 Karachi1 Kanal
DHA Phase 8, Karachi

1 Kanal coastal home, DHA Phase 8 Karachi

5,600 sqft (G+2)

Premium TurnkeyCompleted

DHA Phase 8 construction — FAQ

How much does construction cost in DHA Phase 8 in 2026?

In DHA Phase 8, grey structure runs at PKR 2,400 – 3,500 / sqft and turnkey at PKR 5,800 – 9,000 / sqft in 2026, in line with DHA Karachi rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 8?

The popular plot sizes in DHA Phase 8 are 5 Marla, 1 Kanal, 2 Kanal, 4 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 8?

A typical 1 Kanal home in DHA Phase 8 takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 8?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Karachi cost calculator.

Building in DHA Phase 8?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.