Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA LahoreDeveloping

Construction in DHA Phase 9 Prism

DHA Lahore's largest phase by area — modern grid, expanding commercial belts, and the heaviest pipeline of new 1 Kanal builds.

Status
Developing
Launched
Mid 2010s
Lahore grey rate
PKR 2,200 – 3,200 / sqft
Lahore turnkey rate
PKR 5,500 – 8,500 / sqft

About construction in DHA Phase 9 Prism

Phase 9 Prism is the biggest DHA Lahore phase by land area and the most exciting for new construction. The development is split into blocks A through Z with rolling possession dates, which means there is a constant stream of newly-possessed plots ready for ground-up construction. The phase has a modern, geometry-led road network and is anchored by the Phase 9 Prism commercial belt and the Lahore Ring Road interchange. Most of our 2025 and 2026 1 Kanal grey-structure projects are here. Block-specific bylaw nuances exist — for example, some blocks restrict basement excavation depth based on water-table mapping — and our architects check this on every map submission.

What's distinctive about DHA Phase 9 Prism

  • Largest DHA Lahore phase by land area — newest plot supply
  • Block-by-block possession rollout — fresh inventory every quarter
  • Heaviest 1 Kanal grey-structure pipeline in DHA Lahore
  • Block-specific basement depth checks based on local water tables

Commercial hubs

  • Phase 9 Prism Commercial Belt
  • Block A Commercial

Nearby landmarks

  • Lahore Ring Road
  • Bedian Road

Plot sizes & bylaws in DHA Phase 9 Prism

What you can build, how much you can cover, and what setbacks apply.

PlotDimensionsElevationCoverageSetbacks
5 Marla25×45 ftG+165%F5, S3, R3
10 Marla35×65 ftG+260%F10, S3, R3
1 Kanal50×90 ftG+255%F15, S5, R5

Projects we've built in DHA Phase 9 Prism

Recent and active builds in this area.

10 Marla family home, DHA Phase 9 Prism10 Marla
DHA Phase 9 Prism, Lahore

10 Marla family home, DHA Phase 9 Prism

4,100 sqft (G+2)

Standard TurnkeyCompleted

DHA Phase 9 Prism construction — FAQ

How much does construction cost in DHA Phase 9 Prism in 2026?

In DHA Phase 9 Prism, grey structure runs at PKR 2,200 – 3,200 / sqft and turnkey at PKR 5,500 – 8,500 / sqft in 2026, in line with DHA Lahore rates. The exact figure depends on your plot size, the number of floors and the finish level, so we confirm a written rate once we've seen your drawings.

What plot sizes can you build on in DHA Phase 9 Prism?

The popular plot sizes in DHA Phase 9 Prism are 5 Marla, 10 Marla, 1 Kanal. We build on each of them within DHA's coverage limits, elevation caps and setback rules. Send us your plot size and we'll outline what you can build before quoting.

How long does a build take in DHA Phase 9 Prism?

A typical 1 Kanal home in DHA Phase 9 Prism takes around 10 to 14 months from excavation to turnkey handover, depending on the plot size, design complexity and finish level. We share a realistic, phase-by-phase schedule with every written quote.

Do you handle DHA map approval for DHA Phase 9 Prism?

Yes. We prepare the bylaw-compliant drawing set and submit it to DHA building control for you. DHA works to a 20-working-day target for approval once a complete submission is in — that is a target rather than a guarantee, and timing depends on document completeness and office workload.

For an instant figure by plot size and finish, use the Lahore cost calculator.

Building in DHA Phase 9 Prism?

Send us your plot number and we'll come back within 24 hours with a 2026 written quote and a realistic timeline.