Skip to content
Construction Company DHA24 LIVE SITES · Since 2012
DHA Lahore • 2026

5 Marla house construction cost in DHA Lahore (2026)

Building a 5 Marla house in DHA Lahore costs about PKR 30.80 LakhPKR 54.40 Lakh for grey structure and PKR 77.00 LakhPKR 2.17 Cr for a turnkey (move-in-ready) home in 2026, depending on finish level and built-up area.

5 Marla cost breakdown in Lahore (2026)

Based on a typical 1,400–1,700 sqft covered (built-up) area for a 5 Marla plot. Figures are indicative 2026 estimates — we confirm an exact number after seeing your plot and spec.

Finish levelRate / sqftEstimated total
Grey structurePKR 2,2003,200PKR 30.80 LakhPKR 54.40 Lakh
Standard turnkeyPKR 5,5007,000PKR 77.00 LakhPKR 1.19 Cr
Premium turnkeyPKR 7,0008,500PKR 98.00 LakhPKR 1.45 Cr
Luxury turnkeyPKR 8,50012,750PKR 1.19 CrPKR 2.17 Cr

Grey structure is the bare structural shell; turnkey adds all finishing. See the difference in our grey structure and turnkey pages for Lahore.

What changes a 5 Marla build cost in Lahore

Covered (built-up) area — number of floors and basement

Finish level — grey, standard, premium or luxury turnkey

Material spec — steel grade, cement brand, imported vs local fittings

Phase and plot specifics in Lahore — access, soil, setbacks

Structural extras — basement, pool, boundary walls

Market movement — cement and steel prices through 2026

5 Marla cost in Lahore — FAQ

How much does it cost to build a 5 Marla house in DHA Lahore in 2026?

A 5 Marla house in DHA Lahore costs about PKR 30.80 Lakh–PKR 54.40 Lakh for grey structure, and PKR 77.00 Lakh–PKR 2.17 Cr for a complete turnkey home in 2026, depending on finish and built-up area.

What is the per-square-foot construction rate in Lahore?

In 2026, grey structure in Lahore runs PKR 2,200 – 3,200 / sqft and turnkey PKR 5,500 – 8,500 / sqft. The 5 Marla totals above multiply that by the typical built-up area.

How long does a 5 Marla house take to build?

Grey structure for a 5 Marla typically takes 4–6 months; a full turnkey 5 Marla home usually completes in 10–14 months, depending on spec, basement and weather.

Get an exact 5 Marla quote for Lahore

Send us your plot number and finish preference. We reply within 24 hours with a written 2026 quote.